兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
又爽又黄又无遮挡的视频美女| 中文字幕免费无码专区| 久久亚洲中文字幕精品一区| 99久久精品免费观看国产| 久久精品人人槡人妻人人玩| 最新无码国产在线视频人与| 亚洲AV最新天堂网址| 国产中文三级全黄| 精产国品一二三产品区别大吗知乎| 99精品国产在热久久无毒不卡| 久久婷婷五月综合97色一本一本| 本道久久综合无码中文字幕| 亚洲久悠悠色悠在线播放| 亚洲 欧美 日韩 国产 丝袜| 国产精品黑色丝袜高跟鞋| 久久久久亚洲波多野结衣| 国产精品线路一线路二| 亚洲国产精品成人精品无码区蜜臀| 欧美无人区码卡二卡3卡2022| 又爽又高潮的bb视频免费看| 国产乱子经典视频在线观看| 国产成人不卡无码免费视频| 女人扒开屁股爽桶30分钟| 欧美午夜福利1000集2019年| 中国杭州少妇xxxx做受| 国产成人亚洲精品| 久久久久久伊人高潮影院| 国产亚洲精品自在久久| 精品无码国产自产拍在线观看蜜桃| 国产日产亚洲系列最新| а√天堂www在线а√天堂视频| 亚洲AV 无码片一区二区三区| 亚洲国产精品久久AA片| 男女猛烈无遮掩视频免费软件| 久久久久国产一区二区| 精品国色天香新区卡一卡二| 九九久久精品国产| 人妻 偷拍 无码 中文字幕| 女人被躁到高潮嗷嗷叫免费| 啦啦啦视频在线播放免费| 国产精品伦一区二区三级视频|