兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
日本卡一卡2卡三卡4乱卡乱码| 日本VA欧美VA欧美VA精品| 国产美女高潮流白浆视频| 国产成人无码网站| 四虎成人精品无码永久在线| 国产三级在线观看完整版| 久久99精品久久久久久| 国产成人久久av免费| 优优人体大尺大尺无毒不卡| 日韩码一码二码三码区别69| 久久久久精品少妇9999| 久久精品99国产精品蜜桃| 伊人久久大香线蕉AV网禁呦| 亚洲AV成人一区国产精品| 人人爽天天碰天天躁夜夜躁| 经典国产乱子伦精品视频| 人妻熟妇乱又伦精品视频中文字幕| 免费无遮挡无码永久在线观看视频| 久久综合给合久久国产免费| 无码少妇一区二区三区浪潮AV| 国产精品亚洲А∨怡红院| 亚洲精品国产电影| 本道久久综合无码中文字幕| 野花视频在线观看免费观看最新| 中文字幕 一区二区三区| 少妇高潮惨叫喷水在线观看| 人妻少妇av无码一区二区| 国产在线精品一区二区不卡| 99无人区码一码二码三码| 精产国品一二三产品区别大吗知乎| 国产成人精品日本亚洲77美色| 在线A级毛片无码免费真人| 国产精品久久久久久妇女| 亚洲日韩精品一区二区三区无码| 国产日韩欧美亚洲精品中字| 久久精品国产久精国产思思| 西西人体自慰扒开下部93| 成年网站未满十八禁| 国产特级毛片aaaaaa高清| 亚洲免费人成在线视频观看| 国产在线无码一区二区三区|