兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

美女无遮挡直播软件免费看| 一区二区三区波多野结衣在线观看| 精品国产品香蕉在线| 国产亚洲精品精品国产亚洲综合| 日本高清视频色WWWWWW色| 无码中文字幕乱在线观看| 秋霞在线高清观看视频| 国产乱妇无码大片在线观看| 亚洲av不卡一区二区三区| 国内精品久久人妻无码网站| 玩两个丰满老熟女久久网| 无码AV无码一区二区桃花岛| 日本阿v片在线播放免费| 无码丰满少妇2在线观看| 久草热久草热线频97精品| 色噜噜狠狠狠综合曰曰曰| 综合色区亚洲熟妇P| 女性喷液过免费视频| 农村老熟妇乱子伦视频| 青青草国产线观看| 久久亚洲精品11p| 久天啪天天久久99久久| 极品少妇被猛得白浆直喷白浆小说| 在线观看免费人成视频色| 色先锋av资源中文字幕| 成年免费A级毛片高清香蕉| 欧美人与禽交片在线观看| 免费a级毛片无码免费视频120软件| 精品久久久无码人妻中文字幕边打电话| 韩国无码AV片在线观看网站| 性xxxxx大片免费视频| 久久精品亚洲中文字幕无码麻豆| 中文无码熟妇人妻AV在线| 天天摸日日添狠狠添婷婷| 真实国产乱子伦视频| 亚洲成A人一区二区三区| 亚洲日韩国产精品第一页一区| 国产精品无码一区二区| 一中文字幕日产乱码VA| 亚洲 欧洲 无码 在线观看| 丰满女人又爽又紧又丰满|