兽皇videos极品另类,亚洲av永久无码精品天堂动漫,最近免费中文字幕大全高清10,性无码专区无码

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

欧洲熟妇色XXXX欧美老妇老头多毛| 人人妻人人狠人人爽| 精品深夜AV无码一区二区老年| 少妇高潮惨叫久久久久久| 久久人人爽人人爽人人片av麻烦| 亚洲av无码专区在线厂| 日本高清视频色WWWWWW色| 无码人妻丰满熟妇区五十路| 色综合久久无码中文字幕app| 亚洲精品国产VA在线观看| 亚洲A级成人片在线观看| 亚洲欧美精品午睡沙发| 国产成人a∨麻豆精品| 一二三四视频社区在线播放中国| 福利姬国产精品一区在线| 国产精品99久久精品爆乳| 无码精品视视在线观看星辰影院| 美女无遮挡直播软件免费看| 欧美成人精品第一区二区三区| 亚洲AV成人午夜福利在线观看| 国产热A欧美热A在线视频| 国产精品视频一区二区三区不卡| 国产麻豆精品一区二区三区V视界| 又大又粗欧美黑人aaaaa片| 国产激情内射在线影院| 中文字幕亚洲日韩无线码| 精品久久久久香蕉网| 五月天婷婷激情无码专区| 国产在线观看免费观看| 免费无码中文字幕A级毛片| 伊伊综合在线视频无码| 国产午夜精品一区二区三区老| 国精产品一区二区三区糖心| 中国少女人体艺术| 国精品午夜福利视频不卡757| 久久久久人妻一区精品色欧美| 老子影院午夜精品无码| 亚洲色AV天天天天天天| 麻豆最新国产av原创精品| 人妻丰满熟AV无码区HD| 好男人WWW社区视频在线资源|